Our Projects and Clients

After nearly two decades in the pipeline construction business, M&N Energy Services Ltd. has had the pleasure of working on a number of projects throughout western Canada.

Our experience includes:

  • SAGD flowlines
  • River crossings
  • Pump facilities and pump stations
  • Terminals and bulk product storage
  • Pipeline integrity projects
  • Structural steel construction

Below is a list of some of our most recent clients and the projects we completed for them:

grand cache pipeline project

TRANSGAS – June 2016 – October 2016
28 km of 4” Pipeline
Rocanville, SK

TRANSGAS – August 2015 – September 2015
4.5 km of 4”, 7 km of 6”, 3.5 km of 8” Pipeline
Edam, SK

PENGROWTH – February 2015 – April 2015
18 km of 12” Insulated & 6” Pipeline
Bonnyville, AB

PENGROWTH – January 2014 – June 2015 Above Ground Flowlines:
1990 meters of 16” Sch.60 A106 Gr. B (Steam Line)
1425 meters of 14” Sch.60 A106 Gr. B (Steam Line)
245 meters of 12” Sch.60 A106 Gr. B (Steam Line)
1310 meters of 10” Sch.60 A106 Gr. B (Steam Line)
695 meters of 16” Sch.40 A106 Gr. B (Emulsion Vapour Line)
2965 meters of 14” Sch. STD A106 Gr. B (Emulsion Vapour Line)
1040 meters of 10” Sch. STD A106 Gr. B (Emulsion Vapour Line)
475 meters of 8” Sch. STD A106 Gr. B (Emulsion Vapour Line)
4700 meters of 8” Sch.STD A106 Gr. B (Emulsion Liquid Line)
475meters of 4” Sch.80 A106 Gr. B (Emulsion Liquid Line)
475 meters of 6” Sch.XH A106 Gr. B (Emulsion Liquid Line)
795 meters of 12” Sch. STD A106 Gr.B (Fuel Gas Line)
4930 meters of 3” Sch. STD A106 Gr.B (Fuel Gas Line)
Well Pad D-01– 7 Well Pairs
Well Pad D-03– 8 Well Pairs
Well Pad D-01– 5 Well Pairs

Bonnyville AB
PEMBINA – November 2014 – April 2015
28 km of 12” Pipeline
Grande Cache, AB

PENGROWTH – September 2014 – November 2014
30 km of 10” Pipeline
Bonnyville, AB

TRANSGAS – April 2014 – October 2014
132 km of 16” Pipeline
Bahurst SK to Rosetown SK

CENOVUS ENERGY – October 2013 – May 2014
15 km of 12” Pipeline
Conklin AB

SUNCOR – October 2013 – April 2014
16” OSPL Horse River Line Replacement
10” NG Horse River Line Replacement
Fort Mc Murray AB

PENGROWTH - August 2013 – April 2014
Construct Structural Steel and Piping for 50 mods
Coronation AB

VANTAGE PIPELINE CANADA ULC – March 2013 – November 2013
2 - Pigging Facilities of 10” 4.8 mm Gr.359 CAT II Pipeline.
12 - Block Valve sites of 10” 4.8 mm Gr.359 CAT II Pipeline.
Maple Creek SK to Assiniboia SK

VANTAGE PIPELINE CANADA ULC – August 2012 – November 2013
328 km of 10” 4.8 mm Gr.359 CAT II Pipeline
Maple Creek SK to Assiniboia SK

SUNCOR – August 2012 – October 2012
8 km of 16” Pipeline Replacement
Wandering River AB

SOUTHERN PACIFIC RESOURCES - January 2012 – May 2012
Above Ground Flowlines:
210 meters of 16” Sch.40 A106 Gr. B (Steam Line)
1040 meters of 12” Sch.40 A106 Gr. B (Steam Line)
210 meters of 14” Sch.40 A106 Gr. B (Emulsion Vapour Line)
820 meters of 12” Sch.40 A106 Gr. B (Emulsion Vapour Line)
220 meters of 10” Sch.40 A106 Gr. B (Emulsion Vapour Line)
1030 meters of 10” Sch.40 A106 Gr. B (Emulsion Liquid Line)
220 meters of 8” Sch.40 A106 Gr. B (Emulsion Liquid Line)
1250 meters of 3” Sch. 80 A106 Gr.B (Fuel Gas Line)
Fort Mc Murray AB

CANADIAN NATURAL RESOURCES – January 2012 – April 2012
100 km of 8”, 10” & 12” Pipeline
Wabasca, AB

NEXEN - September 2011 – March 2012
Above Ground Flowlines:
1080 meters of 12” 9.53 mm Gr.448 CAT III Q&T (Steam Line)
1080 meters of 12” 9.53 mm Gr.359 CAT II (Produced Gas Line)
1080 meters of 10” 7.10 mm Gr.359 CAT II (Produced Emulsion Line)
220 meters of 3” 7.62 mm A333 Gr.6 (Fuel Gas Line)
Below Ground Pipeline:
860 meters of 3” 4.8 mm Gr.359 CAT II (Fuel Gas Line)
Anzac, AB

SOUTHERN PACIFIC RESOURCES – November 2011 – February 2012
6 pipe modules fabricated, painted and shipped to site Northwest of Fort McMurray.
Coronation, AB

PENGROWTH - August 2011 – February 2012
Above Ground Flowlines (Pilot Project):
370 meters of 6” Sch.120 A106 Gr. B (Steam Line)
370 meters of 4” Sch.80 A106 Gr. B (Emulsion Vapour Line)
370 meters of 4” Sch.80 A106 Gr. B (Emulsion Liquid Line)
370 meters of 3” Sch. 80 A106 Gr.B (Fuel Gas Line)
Well Pad – with 2 production well heads, 2 Injection well heads
Revamp River water Pump House and Retest P/L
Install 3” Disposal P/L’s
Install 8” Raw Water P/L
Bonnyville, AB

NEXEN LONG LAKE – March 2011 – July 2011
1.7 km of 20” 11.1 wall Gr. 359 Steel Pipeline
Fort McMurray, AB

SOUTHERN PACIFIC RESOURCES – January 2011 – April 2011
16 km of 8” Steel Pipeline and 4.5 km of 6” SDR 6.3 HDPE Pipeline
Fort McMurray, AB

TRANSGAS – August 2010 – October 2010
23 km of 6” PIpeline
North Battleford, SK

TRANSGAS – August 2010 – October 2010
22 km of 6” Pipeline
Stoughton, SK

BESCO – October 2009 – February 2010
18 km 10”, 18 km 8”, 16 km 6” Pipeline
Lampman, SK

CNRL – September 2010 – April 2011
150 km of 2” to 12” Steel and HDPE Pipeline.
Wabasca, AB

INTER PIPELINE FUND – September 2010 – December 2010
Piping ranging from 2”to 24” Wolf Lake Loop Project Build and Install facility upgrades at LaCorey & Wolf Lake
Bonnyville, AB

APACHE CANADA – June 2010 – November 2010
Facility expansions by Brownfield (2-10-39-10 W4m) and Throne (9-15-35-09 W4m), with pipe ranging from 2” to 8” Steel and Fibreglass.
Coronation, AB

NEXEN LONG LAKE – January 2010 – March 2010
18 km 8” steel Pipeline12’ ditch cover
Fort McMurray, AB

CONNACHER OIL & GAS – June 2009 – February 2010
4 km of 6” 8” 10” 12” 14” above ground Steam Line with 3 SAGD Pads
Fort McMurray, AB

INTER PIPELINE FUND – June 2009 – January 2010
Bow River Pipeline Segregation Project Build and install upgrades for 15 facilities pipe ranging from 6” to 16”
Coronation, AB to Milkriver, AB

PETROBANK ENERGY AND RESOURCES LTD. – January 2009 – April 2009
60 km of 6” steel Pipeline and 70 km of 3” and 4” Flexpipe Pipeline
Weyburn, SK

QUICKSILVER RESOURCES – August 2008 – January 2009
6 km OF 16” HDPE, 12 km of 12” HDPE, 20 km of 8” HDPE, 25 km of 6” HDPE,
10 km of 4” HDPE
Penhold, AB

DEVON – November 2008 – December 2008
10 km of 4 & 6”, HDPE Pipeline
Nevis, AB

DEVON – January 2009 – April 2009
80 km of 4”, 8”, 10”, and 12” Pipeline
Conklin, AB

QUICKSILVER RESOURCES – January 2007 – April 2007
50 km of 6, 8, 10, & 12”, HDPE Pipeline
Chigwell, AB

PEMBINA – October 2006 – April 2007
48 km of 6 & 12” Pipeline
Drayton Valley, AB

ROCKYVIEW – October 2006 – April 2007
25 km of 6” Pipeline
Ponoka, AB

DEER CREEK – January 2006 – April 2006
60 km of 8”and 12” Pipeline common ditch
Fort McKay, AB

APACHE ZAMA
50 km of 4” and 6” Pipeline with 25 well tie in
Zama, AB

COMPTON PETROLEUM CORPORATION
40 km of 4 & 6” Pipeline
Gladys, AB

THUNDER ENERGY
20 km of 4” Pipeline
Rycroft, AB

ESPRIT EXPLORATION LIMITED
35 km of 6” insulated Pipeline
Olds, AB

ESPRIT EXPLORATION LIMITED
10 km of 4” Pipeline
Acme, AB

ESPRIT EXPLORATION LIMITED
17 km of 4” Pipeline
Blackie, AB

APACHE CANADA LTD. (C/O MILLENIA RESOURCE CONSULTING)
60 km of 4” & 6” Pipeline
Zama Lake, AB

CANADIAN NATURAL RESOURCES LTD.
110 km of 3”, 4”, & 6” Pipeline
Jean Lake, AB / Leige, AB

SUNCOR ENERGY INC.
5.5 km of 12” insulated Pipeline
Fort McMurray, AB

ESPRIT EXPLORATION LIMITED
20 km of 4” Pipeline
Acme, AB

CONOCO CANADA RESOURCES LTD.
150 km of 3”, 4”, & 6” Pipeline
Hanna, AB

CANADIAN NATURAL RESOURCES
60 km of 12” Pipeline
Elk Point AB, Bonnyville, AB

CANADIAN NATURAL RESOURCES
110 km of 4”, 6” & 8” Pipeline
Wabasca, AB

CANADIAN NATURAL RESOURCES
32 km of 6” Pipeline
Foremost, AB

CANADIAN NATURAL RESOURCES
100 km of 6”, 8”, & 10” Pipeline
Wabasca, AB

More references are available upon request. To connect with us, call 403-578-2016 or email us via our contact form.